Equinor (Formally STATOIL) – Northern Lights

  • FEED contract by Equinor for their ground-breaking Northern Lights Project, to develop an onshore carbon dioxide (CO2) storage terminal in Norway
  • The engineering scope will address the terminal, import jetty topsides, the CO2re-injection lines and associated utilities
  • The first phase of this project will provide storage for up to 1.5 million tonnes of CO2 per year captured from onshore industrial plants in Eastern Norway

North Sea – Dan FG Field

  • CO2 CCS with Enhanced Oil Recovery (EOR)
  • Pre-FEED studies for 6,000 tonne module to be added to existing platform
  • Utilised the expertise of KBR thermodynamic specialists to deliver robust process design

In Salah Gas Project

  • Operating since 2004
  • 1.15 million tonnes of CO2 removed annually from produced natural gas
  • Unit was designed, engineered, constructed and commissioned by KBR
  • Largest operating CCS facility in the world at time of completion

KÅRSTØ Gas Processing Facility

  • Technology and design development study
  • 1 Mtpa CO2 for 420MW gas-fired power plant
  • Optimise base case CO2 capture plant for energy ± 40% cost estimate for optimised capture plant